As part of renovations to the university’s Shafer Hall, we provided and installed new HVAC systems. Other work included removing selective existing piping and installing hydronic piping; cooling towers; air coils; split AC systems; fan coil units; finned-tube radiation heaters; cabinet unit heaters; and propeller unit heaters.