![](https://perfph.com/wp-content/uploads/2020/05/PER01-Eastern-CT-State-Feature.png)
![](https://perfph.com/wp-content/uploads/2020/05/PER01-Eastern-CT-State-University-02.png)
![](https://perfph.com/wp-content/uploads/2020/05/PER01-Eastern-CT-State-University-03.png)
As part of renovations to the university’s Shafer Hall, we provided and installed new HVAC systems. Other work included removing selective existing piping and installing hydronic piping; cooling towers; air coils; split AC systems; fan coil units; finned-tube radiation heaters; cabinet unit heaters; and propeller unit heaters.